24/7 Support
Our team is available around the clock to respond to any urgent transport situation.

We coordinate the transport of construction machinery, precast beams and bridge structures for major infrastructure contractors, with strict attention to site access and the construction schedule
How we operate in construction and infrastructure
Motorway, bridge and metro contractors work to strict construction deadlines. A machine or a precast beam delivered late can hold up an entire site, which is why planning the transport matters as much as the cargo itself.
As a freight forwarder, through our network of verified partner carriers we coordinate the movement of machinery and precast structures, in step with the construction schedule and with the access restrictions specific to each site.

How we work
Three things that keep a site on schedule.
We plan the delivery for the moment the site team needs the equipment, without taking up space too early and without holding up the erection.
We check temporary road access in advance and coordinate, where needed, additional handling equipment through the partners in our network.
We choose step-deck trailers and multi-axle configurations for the long, heavy pieces typical of infrastructure projects.
From site machinery through to precast structures for major infrastructure projects.
The specific challenge
Many infrastructure sites have temporary access, through diversions or compounds still under construction. We check these routes in advance, as they often do not appear on standard maps, directly with the client's project team, to avoid surprises at the delivery point.
For very heavy machinery we coordinate, where needed, cranes or additional handling equipment at destination, through the partners in our network, so that unloading is safe and quick.
Other Project Cargo industries
The same access and scheduling logic, a different kind of cargo.
Why us
We are more than a transport provider — we are your long-term logistics partner.
Our team is available around the clock to respond to any urgent transport situation.
We provide quotes and transport confirmations as quickly as possible, without bureaucracy.
All our shipments are fully insured, giving you peace of mind regardless of type or distance.
Transparent and competitive rates, without hidden costs or unpleasant surprises on the invoice.
From pickup to delivery, we manage all logistics for you with full responsibility.
Frequently asked questions
A machine delivered late holds up a whole site, and temporary access does not show on maps. Here is what you need to know.
A machine that exceeds the legal size or weight limits requires a Special Transport Authorisation, which sets the route permitted, the validity period and the travel conditions. As a freight forwarder, through our partners we coordinate the whole process: the route survey, obtaining the permits and, where relevant, the escorts. That way you receive one complete package, without having to deal with the formalities yourself.
The duration depends on the distance, on how far the load exceeds the standard envelope and on the time needed for the permits, which should be requested at least two weeks in advance. For abnormal load transports between European countries the usual figure is a few days of actual driving, plus the route planning. On request we include an estimated schedule in the project quote.
We choose the trailer according to the dimensions and the weight of the machine, from lowbed platforms through to multi-axle trailers for very heavy loads. For long pieces we use extendable trailers, which provide the length required without raising the centre of gravity. We settle the exact configuration once you send us the equipment specifications.
For precast beams and bridge segments we use step-deck trailers and extendable configurations, matched to the length and the weight of each piece. Through the partners in our network we coordinate the route survey, the size permits and the escorts where necessary. We synchronise the delivery with the erection window, so the structure arrives on site at exactly the right moment.
Yes, we coordinate the transport of heavy equipment such as drilling rigs, piling rigs, bulldozers or graders, on trailers sized for the load in question. For each machine we establish the transport configuration and the permits its dimensions and weight require. At destination we can organise, through partners, the means needed for safe unloading.
Yes, we handle the delivery all the way to site, including on temporary access roads which we check in advance directly with your project team. If the site does not have the means needed for unloading, through our partner network we coordinate cranes or additional handling equipment at the final point. That way the equipment reaches the ground safely, without you depending on the infrastructure already there.
Our team will get back to you in under 2 hours with a personalized quote — no bureaucracy.