We coordinate the transport of grid transformers, generators and power plant equipment for energy operators, with a full weight distribution calculation and the permits required
How we operate in conventional energy
Grid transformers and industrial generators are among the heaviest indivisible pieces moved by road. A 100-tonne transformer can exceed the capacity of many bridges on the standard route, so every delivery calls for careful planning, not simply booking a truck.
As a freight forwarder, we coordinate through our network of specialist partners the weight distribution calculation, the check on the road structures and the heavy haulage permit required for a safe delivery, from one end of the route to the other.

How we work
Three things we settle before confirming the route.
For heavy transformers and generators we check the axle pressure and the strength of every structure on the route before confirming it.
We handle in full the permit required and the approved route for pieces that exceed the standard size and tonnage thresholds.
We configure trailers with 10 to 18 axles for transformers and generators of exceptional tonnage, drawing on specialist partners.
Heavy pieces, often above 40 tonnes, that call for an individual transport calculation and dedicated equipment.
The specific challenge
A transformer over 100 tonnes cannot simply cross any bridge. Every structure on the route has to be checked for load capacity before the route is confirmed; otherwise the risk is either damaged infrastructure or a serious incident.
Through the partners in our network we coordinate that technical check together with the local road authorities and structural engineers, so the approved route is safe along its full length. The tonnage varies significantly: from 40 to 150 tonnes at transformer substations and from 80 to 300 tonnes for thermal or hydro power plant equipment.
Other Project Cargo industries
The same heavy haulage regime, a different kind of equipment.
Why us
We are more than a transport provider — we are your long-term logistics partner.
Our team is available around the clock to respond to any urgent transport situation.
We provide quotes and transport confirmations as quickly as possible, without bureaucracy.
All our shipments are fully insured, giving you peace of mind regardless of type or distance.
Transparent and competitive rates, without hidden costs or unpleasant surprises on the invoice.
From pickup to delivery, we manage all logistics for you with full responsibility.
Frequently asked questions
Transformers and generators call for axle load calculations, bridge checks and a heavy haulage permit. Here is what you need to know.
A grid transformer over 100 tonnes travels on multi-axle configurations or, where the route demands it, on self-propelled trailers, with a weight distribution calculation for every axle. As a freight forwarder, we coordinate through specialist partners the equipment that matches the tonnage, the route approved in advance and the heavy haulage permit, so the delivery is safe from one end to the other.
Before confirming the route, we check the load capacity of every bridge, viaduct and structure along the way against the real weight of the piece, together with the road authorities and structural engineers. That way we avoid both damage to the infrastructure and the risk of an incident, and where no standard route holds, we identify alternatives or temporary reinforcement solutions.
For equipment of exceptional tonnage we configure modular trailers with 10 to 18 axles, and for demanding manoeuvres or short-distance positioning we use self-propelled SPMT platforms. The choice depends on the weight of the piece, the route restrictions and the space available at destination, and we source the equipment through our network of specialist partners.
We handle it all: the route survey and obtaining the heavy haulage permit for every country crossed, including coordinating police escorts where they are compulsory. The dedicated project manager runs the whole technical and administrative file, so that you receive an approved route and a clear delivery schedule.
Planning a generator or turbine transport usually takes between 2 and 4 weeks, depending on the structural checks and the permits required along the route. The cost is calculated individually, based on the weight, the dimensions and the distance, and the project quote includes the weight calculation and the CMR insurance.
Yes, we coordinate door-to-door delivery, from the factory of origin to the final location inside the plant, including the manoeuvre to position it on the foundation where required. Through specialist partners we also arrange the lifting equipment, cranes or SPMT platforms, for the safe unloading and placement of transformers, generators and turbines.
Our team will get back to you in under 2 hours with a personalized quote — no bureaucracy.